Events & Raisings

January 2011 Raising, Bully Hill Vineyards

This timber frame addition is the third phase in a two year project with Bully Hill Vineyards. The 29 ft by 38 ft clear span will be created using a queen post bent system with a parallel chord truss structure running the length.  Other timber post and beam elements will wrap around existing structures connecting them as a unified, sheltered space. After raising, our construction group will be enclosing the new addition.


Location: Bully Hill Vineyards, Keuka Lake
Architect: New Energy Works Design Department
Builder: New Energy Works